Title 8 STREETS AND SIDEWALKS
Chapter 8.64 DRIVEWAY APPROACHES AND CURB CUTS
8.64.080 Construction details.
(a) All driveway approaches between the curb line and the
property line shall be constructed of Portland cement concrete except as
provided in Section 8.64.100. The concrete of the driveway approach, including
the sidewalk section, shall be a minimum of four inches thick for residential
approaches and six inches thick for commercial approaches.
(b) The sidewalk section of the driveway approach shall be
finished and scored as specified by the director of public works for typical
sidewalk construction. Apron and end slope areas of the driveway approach shall
be finished, after trowelling smooth and scoring, with a fiber pushbroom drawn
over the surface parallel to the curb line.
(c) Driveway approaches shall be constructed in accordance
with standard plans for driveway approaches as specified by the director of
public works, a copy of which will be furnished applicant at the time the
application is made. (Ord. B-1996 § 7, as amended by Ord. 993 5; January
22, 1968).